November 15, 2026

Interview with Dr Peter Agada , The Presidential Candidate of Young Progressive Party YPP.

Q&A with Dr. Peter Agada — YPP Presidential Candidate

His Excellency Arc. Dr. Peter A. Agada is a visionary leader, accomplished architect, reform advocate and nation-builder committed to the emergence of a secure, productive, united and prosperous Nigeria.
His leadership vision is founded on integrity, competence, accountable governance and measurable results. He believes that Nigeria’s progress must be felt not only in government institutions, but in every state, local government, ward, community and household.
With a clear focus on national security, economic renewal, job creation, digital governance, institutional reform, infrastructure development and human-capital advancement, he represents a new generation of purposeful leadership prepared to restore public trust and reposition Nigeria for global competitiveness.
His mission is to build a nation where hard work is rewarded, innovation is encouraged, institutions serve the people, opportunities are accessible and prosperity is shared more broadly.
A leader with vision. A reformer with courage. A nation-builder prepared to deliver a new Nigeria.
 Peter Agada is from Ogbadibo LGA  Benue state , DoB – 17th nov 1971 born in Enugu  Nigeria , Had his primary & Secondary studies in Lagos and Graduated from the University of Jos with Masters of Architecture.
Now a PhD Holder in same field but with speciality in Acoustics & C4isr + Electromagnatic spectrum management from Gulf American University. He leads the team of Astute Nigerian Professionals in policy design and Advocacy in a group called Congress of Professionals.
He is the CEO of Cyrus Acoustic Group with which he has handled and driven several large Acoustics , Lighting and HVAC projects with the reputation now as the leading Acoustic firm globally haven recently treated Dunamis Glory Dome 100k seater project tagged to be the world’s largest Auditorium..
On the political scene He was the immediate past Director of finance of the Obedient Movement, The minister of Infrastructure of the Prof Pat utomi big tent and a major policy writter in the obi-datti consumption to production campaign platform of 2023.
He was a Labour chieftain and presidential aspirant until recently when he joined the YPP and is now the Presidential Candidate of the YPP.

Q&A with Dr. Peter Agada — YPP Presidential Candidate

 

Q1. You have never held elected office. Why should Nigerians trust you with the most complicated job in Africa?

You are correct. I have never been Governor or Senator. I have been something more relevant: a Site Architect, Infrastructure Planner, Acoustics Expert and C4ISR Expert, in addition to being an Engineer who has managed 30,000 workers across 36 states without one strike for 15 years. Governing Nigeria is not about politics. It is about managing 200 million people as a construction site, as well as 923,000 square kilometres needing security surveillance and governance of every inch of land and people.

The evidence of capacity is threefold. Administratively, I run an architectural and infrastructure organisation that designs, procures, builds and maintains simultaneously in over 10 of our largest states — dealing with states, LGAs, unions, communities and security agencies, exactly what a Chief Executive does. Financially, I have managed over ₦30 billion in project value without borrowing, without owing salaries, and with every kobo traceable. The Federal Government cannot say the same. Politically, in the Obedient Movement of 2022 to 2023, I coordinated professional volunteer structures in 19 Northern states where the Labour Party had zero structure and delivered 1.2 million votes without one Naira from party headquarters. A politician negotiates interest. An architect resolves constraints. Nigeria does not need another negotiator. It needs a Site Engineer who can say: “This foundation has failed. We must demolish and recast.” My system, LabourDirect, does not fight the National Assembly, Governors or Security Agencies. It gives them what they want most — credit. Every project on LIN shows who approved it, who funded it, which Senator facilitated it. Governors love LIN because it proves they worked.

Q2. LabourDirect — governance with GPS. Give us a practical example of how it changes construction of a road, hospital or school. And how much will it save?

Take a Federal road: Lokoja to Abuja, 200 kilometres. Today, the Ministry conceives the project with no soil test and no traffic count. A consultant copy-pastes a design for ₦80 million. The contract is inflated from ₦200 billion to ₦400 billion and the Minister’s company wins without procurement interrogation. Thirty percent mobilisation is paid, the contractor completes 5 kilometres, abandons the site and demands a ₦150 billion variation. Eight years later the road is 40 percent complete and costs ₦550 billion.

From May 29, 2027, with LabourDirect the process changes entirely. A drone survey combined with LIN Ward reports identifies exact potholes by GPS. Citizens upload video via 3470#. The system auto-generates a Bill of Quantities at zero cost using AI and community input. Design is drawn from a standard Agada-Crete library at ₦5 million, not ₦80 million, with all designs open source. The contract is published on LIN with benchmarked rates — cement at ₦4,500 per bag, iron at ₦450,000 per tonne, labour at ₦5,000 per day. The lowest bidder meeting the Ward Labour Quota of 70 percent Ward artisans wins. Every kilometre requires four photos, GPS coordinates and lab test results uploaded within 48 hours. No photo, no pay. Auto-Freeze. The road is completed in 18 months at ₦90 billion — ₦450 million per kilometre — not ₦550 billion. The Federal Government spends ₦3.2 trillion per year on capital. Our pilot shows savings of 55 to 68 percent on the same specification — ₦1.7 to ₦2.1 trillion annually that can go directly to the Ward First-Line Charge. You will watch your hospital’s foundation, blockwork, roofing and plastering live on your phone.

Q3. How do you stop a Minister, contractor or civil servant from manipulating the system? Will Nigerians see contracts, costs and variations?

Inflation is not a mistake. It is a business model. There are three locks that cannot be manipulated. Lock One is the Price Library — you cannot inflate. Every material, labour rate and equipment rate is published on LIN as a National Price Library, updated quarterly by the NBS. If a Bill of Quantities says cement is ₦4,500 and a Minister approves ₦9,000, LIN flags it red automatically and no human can override without a public hearing. Lock Two is Photo-GPS-Payment — you cannot collect without working. Under LabourDirect, a photo, GPS coordinates, a lab test and Ward Chairman confirmation trigger payment. The system pays the contractor directly, not through the Ministry. This is where the National Council on Procurement comes to the rescue — that is what Peter Agada will do. Lock Three is Citizen Audit — you cannot hide a variation. Dial 3473*Project Code# and you see the original contract value, amount paid, work done as verified by drone, any variation with reason, and the contractor’s name, directors, BVN and other abandoned projects. A Minister seeking a variation must record a five-minute video explanation on LIN. Nigerians comment. To manipulate the system, a civil servant must simultaneously manipulate a GPS satellite, a drone image, a lab test, a Ward Chairman and 10,000 citizens watching. It is impossible.

Q4. Finish-First — who decides which abandoned projects to complete, cancel or redesign? Will you audit?

Nigeria has over 17,000 abandoned Federal projects worth ₦12 trillion, according to the Chartered Institute of Project Managers. In the first 90 days I will sign Executive Order 002: the National Infrastructure Audit, conducted not by a Ministry but by a consortium of COREN, the Nigerian Society of Engineers and 37 universities — one per state, each auditing projects in its own state. Projects go into three buckets. Bucket A is Finish: any project 60 percent complete and economically viable is completed within 24 months — for example, Ajaokuta at 95 percent complete and the Second Niger Bridge access roads. Bucket B is Redesign: viable projects with obsolete designs are redesigned using Agada-Crete and downsized — for example, a 10,000-bed hospital where only 500 beds are needed. Bucket C is Cancel and Sell: projects under 20 percent complete with no road to site are cancelled, the steel sold, land recovered and the contractor prosecuted. Who decides? Not the President. A Decision Matrix on LIN scores every project on percentage completion, economic viability, community need by USSD vote and cost to complete. A score above 70 triggers the Finish Rule. No new Federal project is approved until Bucket A is 80 percent cleared, except Ward projects under ₦40 million.

Q5. Where will you cut expenditure? How much? And how will you finance without borrowing?

Nigeria’s problem is not a lack of money. It is ₦1.2 trillion in overhead that produces nothing. My cuts: full deregulation of fuel and local refining at clusters saves ₦4.5 trillion from hidden NNPC spending. Merging 260 duplicated MDAs to 120 using the Oronsaye Report saves ₦1.2 trillion. A 70 percent cut in travel, estacode and new vehicles through LIN virtual FEC meetings and Made-in-Nigeria vehicles saves ₦770 billion. Paying only verified debt after audit saves ₦1 trillion from the ₦8 trillion debt service bill. Publishing Security Votes on LIN and cutting 50 percent saves ₦400 billion. Total annual savings: approximately ₦7.87 trillion.

On financing without foreign borrowing: 70 percent of roads and housing will be built by Ward Labour Cooperatives, cutting labour costs by 60 percent. An Infrastructure Bank will deploy ₦7.8 trillion in savings alongside ₦19 trillion in Pension Funds and a Diaspora Bond, lending at 5 percent to clusters rather than 18 percent from commercial banks. Transparent LIN-based concession of 10 Federal assets — airports and toll gates — generates ₦3 trillion upfront for reinvestment. Foreign borrowing is limited to rail and power that generate direct revenue, and every loan carries a GPS-linked project and repayment plan on LIN. We will not replace foreign debt with local debt. We will replace debt with efficiency.

Q6. You admire Peter Obi and contributed to “Consumption to Production.” Why Agada and not Obi in 2027?

Peter Obi is my elder brother and a leader I respect. He is a trader who knows how to manage resources prudently. I am an architect who knows how to create resources from waste. The differences are fundamental. Obi pursues prudent management of existing costs — Agada destroys cost, bringing a road from ₦1.2 billion per kilometre to ₦450 million through material science. Obi moves from consumption to production via import substitution — Agada establishes Ward-to-Cluster production where 37 clusters process what Wards grow, not just farming more but processing at source. Obi saves money in banks — Agada invests ₦40 million per month per Ward directly on LIN with no state intermediary. Obi publishes accounts annually — Agada delivers real-time GPS tracking so you see the cement bag arrive at your school site on your phone today. Under Obi, the Federal Government leads development — under Agada, the Ward leads and the Federal Government supports. It is a reversal of the pyramid. Peter Obi will manage Nigeria’s poverty well. Peter Agada will engineer Nigeria out of poverty with lower-cost technology. Obi is a good manager of the old system. Agada is the designer of a new system. 2023 was about saving Nigeria from collapse. 2027 is about building a new Nigeria.

Q7. Security — what will you do in the first 100 days that others have not done? And how do you avoid becoming another failed technology project?

Others bought technology. I will build the infrastructure for security. In the first 100 days I will issue three orders. Order One is the Ward Security Architecture: every Ward gets 10 trained Ward Security Volunteers — not vigilante, but personnel operating under the Police, paid from the Ward Account of ₦40 million, feeding intelligence via LIN 3479#. No intelligence filed, no salary next month. Order Two is the Drone Corridor and LIN Surveillance Grid: Nigerian-made drones built at clusters with a 50-kilometre range, three per LGA, totalling 2,322 drones at ₦20 million each — ₦46 billion versus ₦500 billion previously spent on failed CCTV — operating from Agro-Industrial Clusters, not Abuja. Order Three is the End of the Ransom Economy: any bank account receiving a ransom not frozen within six hours makes the bank’s Managing Director personally liable, tracked via BVN on LIN. Ransom is paid via POS today. We track POS. Previous technology failed because it was Abuja-contractor technology — a contractor sells cameras in Abuja and no one maintains them. My technology is Ward-artisan technology. The drone is built and maintained at the cluster by a Ward artisan who loses his job if it fails. Security is not a technology problem. It is an employment problem. An employed youth does not kidnap.

Q8. What are your measurable targets by May 2031?

Electricity: 12,000MW on the national grid, 18 hours per day in all Wards and 22 hours per day at all 37 clusters. Roads: 15,000 kilometres of new concrete roads, 20,000 kilometres rehabilitated and 88,090 kilometres of Ward roads. Housing: 2 million units at ₦4.5 million mortgage. Jobs: 5 million direct and 15 million indirect through clusters. Agriculture: rice at 15 million metric tonnes, palm oil at 4 million metric tonnes, tomato post-harvest loss from 50 percent to 5 percent. Poverty: multidimensional poor reduced from 133 million to 83 million. All verifiable on LIN via *347#.

Q9. How do you convert your blueprint into votes without APC or PDP machinery?

We are not competing with their machinery. We are making their machinery irrelevant. APC and PDP need 774 LGA Chairmen to distribute money. We need 8,809 Ward Enterprise Leaders to distribute opportunity. Former Obidients are joining because 2023 proved that structure is not Governors — structure is 10,000 people at the Ward level who believe. We have 2,700 coordinators now. By December 2026 we will have 8,809. Elections are won at the Polling Unit. Our member is already at the Polling Unit because his job site is there.

Q10. Give us three promises. If you fail them, you failed.

One — Ward First-Line Charge: if by December 31, 2027, ₦40 million per month is not entering every Ward Account and viewable on *347#, I failed. Two — Cost Cap: if by May 2029, one kilometre of Federal Road still costs above ₦450 million and one megawatt of power above ₦120 million, I failed. Three — Electricity You Can Feel: if by May 2031, your Ward has not had 18 hours of power daily for 90 consecutive days as recorded on LIN, I failed. And one more — if by May 2031, you cannot dial 3473# and see every contract, variation, payment and completion percentage on every Federal project, I failed.

Q11. If LabourDirect can save billions, why wait for you to become President? Would you hand it to Tinubu tomorrow?

It has been offered. It was rejected — because transparency blocks overheads. A Permanent Secretary told me in 2018: “Peter, if we implement this, how do we retire funds?” Would I hand it to President Tinubu tomorrow? Yes — not for free, but with the source code, and I will suspend my presidential ambition to lead implementation personally. If President Tinubu signs Executive Order 001 tomorrow — Ward ₦40 million direct to Ward on LIN with Auto-Freeze — I will move to Abuja next week to implement it. My goal is not to be President. My goal is that Nigeria stops leaking. If he does not sign, then Nigerians must hire a new Site Engineer in 2027.

The Atlantic Digest | atlanticdigest.com © 2026